Tuesday, August 27, 2013

LCS 4 completes acceptance trials

MOBILE, Ala. -- The future USS Coronado (LCS 4) successfully concluded acceptance trials after completing a series of graded in-port and underway demonstrations for the Navy's Board of Inspection and Survey (INSURV). Acceptance trials are the last significant milestone before delivery of the ship later this fall. During the four-day trial, the Navy conducted tests intended to demonstrate the performance of the propulsion plant, ship handling and auxiliary systems. While underway, the ship successfully performed launch and recovery operations with both the 7-meter and 11-meter rigid hull inflatable boats, a four-hour full power run, surface and air self defense detect-to-engage exercises, and demonstrated the ship's tremendous maneuverability performing tight turns and accomplishing speeds in excess of 40 knots. Following commissioning, Coronado will be homeported in San Diego with its sister ships USS Freedom (LCS 1), USS Independence (LCS 2) and USS Fort Worth (LCS 3). The Independence-class LCSs are built in Mobile, Ala., by Austal USA. (Source: NNS, 08/27/13)