Wednesday, June 15, 2011
JHSV module damaged
MOBILE, Ala. - A 50-ton block of the second Joint High Speed Vessel being built at Austal USA broke loose over the weekend, fell three feet and tipped over, the shipbuilder confirmed to Navy Times. The block is one of 44 units that make up a JHSV. The extent of the damage to the module and the cost of repairs are still being assessed. The shipyard is building JHSVs and littoral combat ships. (Source: Navy Times, 06/14/11)
Command at SSC gets new leader
STENNIS SPACE CENTER, Miss. - A change of command ceremony took place at the Naval Oceanography Operations Command at Stennis Space Center last week. Capt. Van Gurley assumed command, relieving Capt. David J. Walsh, who has commanded since November 2009. Gurley has served two previous tours in Mississippi, and was the first commanding officer of the Naval Oceanography Anti-Submarine Warfare Center from 2006 to 2008. The NOOC, an Echelon IV command of the Naval Meteorology and Oceanography Command at SSC, is comprised of over 1,000 military and civilian personnel located at seven globally distributed subordinate commands supporting every warfare area in the fleet. Rear Adm. Jonathan W. White, Commander, Naval Meteorology and Oceanography Command, presided over the ceremony. (Source: NNS, 06/14/11)
Monday, June 13, 2011
Oil impact causes rift
MOBILE, Ala. - Questions about the severity of the Gulf oil spill's environmental impact have divided officials along state lines and are now creating discord even within coastal Alabama. Data collected so far show that the spill's effects have been "minor" east of Louisiana, according to George Crozier, executive director of the Dauphin Island Sea Lab. But a letter sent by environmental groups to the Obama administration warned of a "growing health crisis." Casi Callaway, whose Mobile Baykeeper group signed on to the letter, said that while it would be irresponsible to "cry wolf," it would also be irresponsible to conclude there's no problem. An estimated 206 million gallons of crude gushed into the Gulf last spring and summer after the Deepwater Horizon rig exploded, killing 11 workers. (Source: Mobile Press Register, 06/12/11)
Saturday, June 11, 2011
Data portal earns Gulf Guardian award
STENNIS SPACE CENTER, Miss. - The Gulf of Mexico Coastal Ocean Observing System - Regional Association of College Station Texas will receive a Gulf Guardian Award for 2011 in the partnership category. The awards ceremony will be in conjunction with the Gulf of Mexico Alliance Meeting Aug. 3 in New Orleans. The GCOOS Data Portal Project spans the entire Gulf coast and engages people from academia, state and local government and the private sector. The Gulf of Mexico Program initiated the Gulf Guardian awards in 2000 to recognize businesses, community groups, individuals, and agencies that are taking positive steps to keep the Gulf healthy, beautiful and productive. (Source: EPA, 06/09/11)
Thursday, June 9, 2011
Taber to work on LCS, JHSV components
MOBILE, Ala. - Taber Extrusions will build components for a littoral combat ship and joint high-speed vessel being built by Austal USA of Mobile, Ala. The work will be done at Taber's two manufacturing facilities, one in Gulfport, Miss., and the other in Russellville, Ark. Austal will use Taber extrusions for decking, superstructure and bulkheads. The work is for the LCS Jackson and JHSV Fortitude. (Source: Mobile Press-Register, 06/08/11)
Sunday, June 5, 2011
Union gets another shot at Austal
MOBILE, Ala. - A union is getting a third shot to enlist workers at Austal USA's Mobile River shipyard, and an election could come as soon as late July. That's according to a lawyer representing Local 441 of the Sheet Metal Workers International Association. That group has been trying to represent Austal's workforce since 2002. Two previous elections were vacated by federal authorities who found that the company engaged in unfair labor practices with respect to the organizing effort. (Source: Mobile Press-Register, 06/05/11)
Thursday, June 2, 2011
Contract: Huntington Ingalls, $25.3M
Huntington Ingalls Industries, Pascagoula, Miss., is being awarded a contract modification in an amount not-to-exceed $25,300,000 to previously awarded contract for long lead time material for DDG 113. Work will be performed in Cincinnati, Ohio (60 percent), and Pascagoula (40 percent), and is expected to be completed by June 2011. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Source: DoD, 06/02/11)
Wednesday, June 1, 2011
Was the dispersant worth it?
PENSACOLA, Fla. - The chemical sprayed in the Gulf to break up the BP oil spill may not have been effective and could be damaging the ecosystem, according to preliminary findings by University of West Florida researchers. When mixed with oil, Corexit is toxic to phytoplankton and bacteria, crucial to the Gulf of Mexico's food chain, said Wade Jeffrey, a UWF biologist with the Center for Environmental Diagnostics and Bioremediation. BP dumped nearly 2 million gallons of the dispersant in the Gulf, which saw more than 172 million gallons of oil leak into the water in the wake of the April 20 Deepwater Horizon explosion. (Source: Pensacola News Journal, 05/31/11)
Saturday, May 28, 2011
Destroyer arrives in Mobile
MOBILE, Ala. - The William P. Lawrence arrived in Mobile on Friday, where her crew will remain until the formal commissioning ceremony on June 4. After the commissioning, the ship will head for its home port in San Diego. The ship is 510 feet long and carries a crew of about 300. The 60th Arleigh Burke-class destroyer was built at Ingalls Shipbuilding in Pascagoula, Miss., and is the 28th destroyer and 90th surface combatant from the Pascagoula shipyard. The ship is named for Vice Adm. William Porter Lawrence, who received his Naval Aviator Wings at Naval Air Station Pensacola, Fla. (Source: Mobile Press-Register, 05/28/11)
Friday, May 27, 2011
Contract: General Dynamics, $744.1M
General Dynamics National Steel and Shipbuilding Co., San Diego, Calif., is being awarded a $744,129,956 modification to previously awarded contract for the procurement of the detail design and construction of two mobile landing platform ships. Work will be performed in San Diego, Calif. (62 percent); Mobile, Ala. (7 percent); Pittsburgh, Pa. (6 percent); Beloit, Wis. (5 percent); Crozet, Va. (2 percent); Chesapeake, Va. (2 percent); and Belle Chasse, La. (1 percent), with other efforts performed at various sites throughout the United States (8 percent) and outside the United States (7 percent). Work is expected to be complete by February 2014. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Source: DoD, 05/27/11)
VT Halter wins contract
VT Halter Marine won a contract to build a 112-foot offshore articulated tug barge for New York-based Bouchard Transportation Co. Inc. The tug will be similar to others built for Bouchard in previous years by Halter Marine. Construction is set to begin next month at the Moss Point Marine facility in Escatawpa, with delivery September 2012. The company has 1,800 workers at yards in Moss Point, Pascagoula and Escatawpa. (Source: Mississippi Press, 05/26/11)
Navy rejects ship
A new ship designed to carry a billion-dollar ballistic missile tracking radar failed its acceptance trials earlier this month and will need repairs before it can enter service. The Howard O. Lorenzen, built by VT Halter Marine at Moss Point, Miss., is a 534-foot-long ship intended to carry the Cobra Judy Replacement radar, a key sensor used in treaty monitoring and verification for ballistic missile issues. Repair will be done at Kiewit Offshore Services in Corpus Christi, Texas. (Source: Defense News, 05/26/11)
Sunday, May 22, 2011
Avondale to be subject of study
NEW ORLEANS, La. - As the Avondale shipyard moves toward closing in 2013, researchers from several universities are teaming to study the 73-year-old facility's economic and cultural contributions to the region. In the coming months, faculty from Loyola, Tulane, Southern University New Orleans and the University of New Orleans plan to survey current and former shipyard employees on a range of topics. Part of the research will focus on examining potential mental and physical health impacts the winding down of the facility may be having on its shrinking workforce. Northrop Grumman, which owned the yard until it was spun off as part of Huntington-Ingalls, decided last year to close the yard. (Source: Times-Picayune, 05/22/11)
Austal growth and the Big Six
MOBILE, Ala. - Austal USA's transformation from a commercial ferry builder to a player for Department of Defense contracts has been impressive. But it isn't yet in the same league as the Big Six. Part of the reason it still needs to prove the value of the ships it's building, and get into position to build even more complex vessels. (Source: Mobile Press-Register, 05/22/11)
Friday, May 20, 2011
DDG 110 leaves Pascagoula shipyard
The Navy's latest Aegis guided missile destroyer, the William P. Lawrence, left Ingalls Shipbuilding Thursday and headed out for several days in the Gulf of Mexico. It will later arrive in Mobile, Ala., for its June 4 commissioning before heading to its home port in San Diego. The ship is 510 feet and weighs 9,500 tons and can carry a crew of 300. Four gas-turbine propulsion plans will power the ship to speed above 30 knots. Christened in April 2010, DDG 110 honors the late Vice Adm. William P. Lawrence, who spent nearly six years as a prisoner of war in North Vietnam. The ship is the 28th destroyer built at the Pascagoula shipyard. (Sources: Sun Herald, 05/19/11, Mississippi Press, 05/20/11)
Wednesday, May 18, 2011
Oysters likely to be wiped out
BILOXI, Miss. - As record amounts of freshwater head down the Mississippi River toward the Mississippi Sound, the oyster industry can expect to face extreme losses, an official with the Department of Marine Resources said Tuesday. Oysters will be hit hard because they're a stationary species; shrimp, finfish and crabs, which are mobile, are expected to be able to move ahead of freshwater entering the salty waters of the Sound, and the effect on the adults should be minimal, said Scott Gordon, director of the Shellfish Bureau, Office of Marine Fisheries. (Source: Sun Herald, 05/17/11)
Monday, May 16, 2011
Some fish healthy, some not
Alabama researchers fishing within 15 miles of Dauphin Island last week caught more than 300 red snapper and found no sign of infection. The Alabama scientists also caught vermillion snapper, lane snapper, triggerfish and ruby red lips, none of which showed any visible abnormalities. A team from Louisiana State University working off Alabama earlier in the week reported catching some fish in the same area that showed signs of disease, either lesions on the skin or internal damage to the liver. Concern over marine life increased in the wake of last year’s Deepwater Horizon oil spill. (Source: Mobile Press-Register, 05/15/11)
Tuesday, May 10, 2011
Ingalls to research welding improvements
Huntington Ingalls Industries' Pascagoula, Miss., shipyard won a $2.7 million grant for a project to improve shipyard welding. Ingalls was one of six shipyards sharing about $14.6 million in project grants from the National Shipbuilding Research Program. Funding is from the U.S. Navy and industry groups. The idea is to develop a process to eliminate over-welding to reduce distortion. (Source: Mobile Press-Register, 05/09/11)
Saturday, May 7, 2011
Another concern for Gulf?
The Army Corps of Engineers plans to open the Bonnet Carre Spillway Monday, sending fresh water through Lake Pontchartrain, through a strait and into the Gulf of Mexico. It’s rarely done because of the effect it has on the marine life and the Mississippi Sound. But the Mississippi River is rising, and it is an attempt to divert some of the water before it gets to New Orleans. One concern, in addition to marine life, is it could impact the oil spill research. (Source: Sun Herald, 05/06/11)
Thursday, May 5, 2011
Army transfers JHSVs to Navy
The Army has transferred to the Navy all five of its Joint High Speed Vessels. The Memorandum of Agreement was signed May 2, and clarifies relationships, identifies roles and responsibilities and provides an implementation plan. Initially the JHSV program was envisioned to have five of the first 10 JHSVs assigned to the Army, with the Navy getting the rest. But at the Army/Navy Warfighter Talks in December 2010, both services agreed to assign all of the vessels to the Navy. The Military Sealift Command will crew the JHSVs with civilian mariners or contract mariners. Joint High Speed Vessels will be used for fast transport of troops, military vehicles and equipment. (Source: NNS, 05/05/11) Gulf Coast note: The catamaran ships are built by Austal USA in Mobile, Ala.
Subscribe to:
Posts (Atom)