Saturday, November 19, 2011
Navy updates sci-tech priorities
WASHINGTON - The Office of Naval Research has released the latest update to the Naval Science and Technology Strategic Plan. It reflects future naval requirements, including a new emphasis on autonomous systems. "Our superiority at sea demands that we maintain superiority in science, engineering and technology," said Sean J. Stackley, assistant secretary of the Navy for research, development and acquisition. Key areas of difference between the 2011 biannual plan and the 2009 version include a new emphasis on accelerating insertion of mature technologies to the fleet and consolidating 13 “S&T Focus Areas” into nine, including the new category of Autonomy and Unmanned Systems. It also places an emphasis on science, technology, engineering and mathematics initiatives aimed at increasing the talent pool of future naval scientists and engineers. ONR provides the science and technology necessary to maintain the Navy and Marine Corps' technological advantage. (Source: NNS, 11/17/11) Gulf Coast note: The region is involved in unmanned systems and is also home to a Naval Research Lab detachment at Stennis Space Center, Miss.
LPD 22 finishes acceptance trial
![]() |
| LPD 22. Ingalls photo |
Friday, November 18, 2011
Shipyard workers get details
PASCAGOULA, Miss. - Workers at Ingalls Shipbuilding this morning received flyers outlining the terms of a proposed 3-year contract extension between all unions at the Pascagoula facility and the shipyard. The extension would take the contract to March 8, 2015 and includes three wage increases and a $1,000 bonus in lieu of cost of living adjustments. Union members will vote Dec. 1. (Source: Sun Herald, 11/18/11)
Thursday, November 17, 2011
Signal to repair rig
MOBILE, Ala. - Signal International, headquartered in Mobile, will repair an oil rig damaged off the coast of west Africa, the company said. Signal sent a crew to Port Gentil in Gabon to help transport the Hercules 185 jack-up rig across the Atlantic Ocean and Gulf of Mexico to the company's Pascagoula, Miss., repair yard. It's expected to arrive Nov. 29. Signal will hire up to 300 workers over the next month or two to complete the job and others. (Source: Mobile Press-Register, 11/17/11)
Two shipbuilders land contracts
VT Halter Marine of Pascagoula, Miss., and Eastern Shipbuilding Group of Panama City, Fla., each were chosen to build eight offshore supply vessels for Covington, La.-based Hornbeck Offshore Services, according to the company. The Mississippi Press reports that Hornbeck's contracts with the two companies for 16 vessels is valued at some $720 million. (Source: Mississippi Press, 11/17/11)
Ingalls to offer contract extension
PASCAGOULA, Miss. - Ingalls Shipbuilding confirmed to the Sun Herald that it's going to offer workers a three-year contract extension. The details of the proposal have been negotiated between the company and union leaders and will be explained in a flier to be handed out Friday beginning with the first shift at 6 a.m. Workers who are members of a union will have an opportunity to vote on this issue Dec. 1. (Source: Sun Herald, 11/17/11)
Keel laid for first DDG 1000
![]() |
| DDG 1000. U.S. Navy illustration |
Tuesday, September 27, 2011
Tank-raised trout released
OCEAN SPRINGS, Miss. – The Gulf Coast Research Laboratory released thousands of young trout into local waters Tuesday as part of a replenishing program. A portable fish tank brought 12,000 speckled trout fingerlings from the lab to the Cedar Point boat launch. The fingerlings were released into the estuary waters of the Bay of St. Louis. The lab’s trout re-stocking program was launched several years ago. The fish are raised in tanks then released to replenish wild stock. (Source: WLOX-TV, 09/27/11)
Study: Home prices will suffer from closing
NEW ORLEANS - Realtors expect home values to fall by more than 20 percent on the west bank with the closing of the Avondale Shipyard. Most think home prices across the metropolitan area will also be affected. That's according to a study by the Avondale Shipyard Research Project, a consortium of four universities. During initial interviews at the Avondale Shipyard, workers immediately started expressing concerns about housing. Last year, Northrop Grumman said it would close the 5,000-worker shipyard in 2013. The yard, which is down to 3,000 workers, is now owned by Huntington Ingalls, which was spun off from Northrop Grumman. (Source: New Orleans Times-Picayune, AFL-CIO, 09/26/11)
Monday, September 26, 2011
Contract: Huntington Ingalls, $698M
Huntington Ingalls Inc., Pascagoula, Miss., is being awarded a $697,629,899 fixed-price-incentive contract for DDG 114 construction. On June 15, 2011, Huntington Ingalls was awarded a $783,572,487 fixed-price-incentive contract for DDG 113 construction. At the time of contract award, the Navy did not release the contract award amount because it was considered source selection information. For DDG 114 construction, significant amounts of work will be performed in Pascagoula, Miss.; Cincinnati, Ohio; Walpole, Mass.; York, Pa.; Charlottesville, Va.; Erie, Pa.; and Burns Harbor, Ind. Work is expected to be completed by July 2018. This contract was procured via a limited competition between Huntington Ingalls and Bath Iron Works. In addition, Bath Iron Works, Bath, Maine, is being awarded a $679,600,348 fixed-price-incentive contract for DDG 115 construction. This contract includes options for DDG 116 construction valued at $665,016,688. Significant amounts of work will be performed in Bath/Brunswick, Maine; Cincinnati, Ohio; Walpole, Mass.; Brunswick, Ga.; Coatesville, Pa.; Falls Church, Va.; Indianapolis, Ind.; York, Pa.; South Portland, Maine; Charlottesville, Va.; Tulsa, Okla.; Anaheim, Calif.; and Portland, Maine. Work is expected to be completed by August 2017. This contract was procured via a limited competition between Bath Iron Works and Huntington Ingalls. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. (Source: DoD, 09/26/11)
Wednesday, September 21, 2011
Nonprofit proposes hatchery, aquarium
FORT WALTON BEACH, Fla. – The Destin-based nonprofit AquaGreen wants to build a marine life center on Okaloosa Island. The pitch for the proposed fish hatchery and aquarium was made to Okaloosa County commissioners at a board meeting. The county owns a 35-acre parcel on the north side of U.S. Highway 98 where the group wants the aquarium. AquaGreen’s facility would include a 30,000-square-foot interactive aquarium and 50,000 square feet of hatcheries, nurseries, classrooms and labs. (Source: Northwest Florida Daily News, 09/20/11)
Bids sought for maritime academy
PASCAGOULA, Miss. - Jackson County is inviting companies to bid on a $20 million maritime training facility to be built on Ingalls Shipbuilding property. On Monday, the Board of Supervisors and Port Authority's Board of Commissioners passed a joint resolution to advertise bid on the shipbuilding academy. The project, funded through a Hurricane Katrina community development block grant, will help Ingalls expand its two- to four-year apprentice program to about 1,000 students, leaders have said. Construction on the 76,000-square-foot facility is expected to take 18 months. (Source: MississippiPress, 09/20/11)
Wednesday, September 14, 2011
Navy to christen JHSV Spearhead
MOBILE, Ala. - The Navy will christen the Joint High Speed Vessel "Spearhead" Saturday at 10 a.m. CDT in Mobile. The 338 foot-long aluminum catamaran is being built by Austal USA. Spearhead and the nine other JHSVs under contract allow intra-theater transportation of troops, military vehicles, supplies and equipment. They can transport 600 short tons 1,200 nautical miles at an average speed of 35 knots and can operate in shallow-draft ports and waterways. JHSVs aviation flight decks can support day and night air vehicle launch and recovery operations. Sen. Jeff Sessions of Alabama will deliver the ceremony's principal address. (Source: DoD, 09/14/11)
Tuesday, September 13, 2011
Supervisors OK Ingalls tax break
PASCAGOULA, Miss. - Huntington Ingalls was granted 10-year exemptions Monday by Jackson County supervisors on a portion of its ad valorem taxes. The board unanimously granted two separate exemptions on some newer equipment and property at the shipyard, but the shipyard would still have to pay about 18 mills of the county’s 51.3 mills tax rate. Some tax funds must still be collected for school funds, roads and other expenses, supervisors said. (Source: Sun Herald, 09/12/11)
Friday, September 9, 2011
Ingalls gets cutter contract
![]() |
| Huntington Ingalls photo |
Austal rolls out JHSV
MOBILE, Ala. - Austal USA rolled its first Joint High-Speed Vessel out of the shed and onto a dry dock floating in the Mobile River. The high-speed transport was floated down to BAE Systems, where it is scheduled to be put into the water Sunday. The ship, slated to be delivered to the Navy early next year, is the first in a $1.6 billion, 10-ship contract awarded to Austal in 2008. The JHSV can carry soldiers and cargo at an average speed of 40 mph. Vehicles will be able to roll off even in shallow-water ports. (Source: Mobile Press-Register, 09/09/11)
Austal ship to visit Pensacola
The USS Independence (LCS 2), the littoral combat ship built at the Austal USA shipyard in Mobile, Ala., will visit Naval Air Station Pensacola, Fla., on Sept. 12 to conduct shipboard mission module testing over the next several weeks. Base officials say LCS 2, new generation ship with an aluminum trimaran design, will not be open for tours to the public and fishermen and boaters are reminded that a 5000-foot cordon around the ship will be enforced. (Source: Gosport, 09/09/11)
Wednesday, September 7, 2011
USS New York to be in NYC for 9/11
The amphibious transport dock ship USS New York will travel to New York City to participate in events honoring the victims and responders from the Sept. 11, 2001 terrorist attacks. The announcement was made by Secretary of the Navy Ray Mabus and New York City Mayor Michael R. Bloomberg. (Source: DoD, 09/06/11) Gulf Coast note: The ship's bow as made with steel recovered from the World Trade Center. It was built by Northrop Grumman shipyard in Avondale, La. The yard is now part of Huntington Ingalls Industries.
Thursday, September 1, 2011
Austal impresses Roughead
MOBILE, Ala. - Chief of Naval Operations Adm. Gary Roughead visited Austal USA's Mobile shipyard and called it "a model for others to follow." He said he's excited about the commitment and innovation that's gone into the shipyard, which he considers on the leading edge of shipbuilding. Austal, Mobile's largest industrial employer with more than 2,100 workers, is building littoral combat ships and high-speed transports and expects to double the size of its workforce in the next few years. (Source: Mobile Press Register, 08/31/11)
Ingalls starts work on new cutter
PASCAGOULA, Miss. - Ingalls Shipbuilding celebrated the "start of fabrication" of the U.S. Coast Guard's fourth National Security Cutter, Hamilton (WMSL 753). The milestone signifies that 100 tons of steel have been cut and fabricated utilizing a robotic plasma arc cutting machine at Ingalls' steel fabrication complex. Ingalls received the $480 million contract to build Hamilton in November 2010. The ship is scheduled to be delivered to the U.S. Coast Guard in the fall of 2014. Ingalls has delivered the first two NSCs, Bertholf (WMSL 750) and Waesche (WMSL 751). Stratton (WMSL 752), the third of eight planned ships in the Legend class of cutters, will be delivered to the Coast Guard Friday. (Source: Huntington Ingalls via GlobeNewswire, 08/30/11)
Subscribe to:
Posts (Atom)


