Thursday, November 21, 2013

Port gets new director

PENSACOLA, Fla. -- Amy Miller, the Port of Pensacola's chief financial and human resources officer, has been named director by Mayor Ashton Hayward. She's the first female director since the port's inception in the mid-1700s, and the only woman currently serving as port director in Florida. Miller takes over from Clyde Mathis, who joined the port as director in 2006 and resigned. Miller worked at ports in South Louisiana and Gulfport, Miss., and joined the Pensacola port in 2002 as manager of business and trade development. (Source: Pensacola News Journal, WEAR-TV, 11/20/13)

Wednesday, November 20, 2013

Navy AUV sets record

The Naval Research Laboratory's Acoustics Division, with Bluefin Robotics, set a record 315-mile long-endurance autonomous research mission using Reliant, its heavyweight-class mine countermeasures underwater vehicle (AUV). Reliant, when equipped with a low frequency broadband sonar system, is the prototype for the new U.S. Navy Knifefish mine-hunter. The 20 foot long, 1,350 pound AUV left Boston Harbor and traveled south past Cape Cod, then west through Nantucket Sound between Martha’s Vineyard and the mainland, then south of Long Island to the approaches to New York City. It traveled at a depth of 10 meters and an average speed of 2.5 knots. The vehicle surfaced at 20-kilometer intervals to report position via Iridium satellite and made Upper New York Bay with a 10 percent energy reserve. The system is designed to help the Navy detect and identify undersea volume and bottom mines in high-clutter environments. The Knifefish system is a part of the Littoral Combat Ship mine countermeasure mission package. (Source: Business Wire, 11/20/13) Gulf Coast note: Stennis Space Center, Miss., is home of an NRL detachment, the Naval Oceanography Mine Warfare Center and the Naval Oceanographic Office, which operates a fleet of unmanned underwater vehicles; A variant of the Littoral Combat Ship is built by Austal USA in Mobile, Ala.; The Naval Surface Warfare Center Panama City, Fla., Division conducts RDT&E in technologies for warfare in littoral regions, including mine warfare systems and mines.

Signal backlog adds two oil rigs

MOBILE, Ala. -- Signal International announced it's been awarded a contract to repair two oil rigs in the Gulf of Mexico. The company is scheduled to repair six offshore oil rigs, a backlog that will boost hiring at the company, officials said. Headquartered in Mobile, the marine construction and offshore drilling firm operates shipyards and ship repair facilities in Pascagoula, Miss. and Orange, Texas. All of the drilling rig repair work will be done in Mississippi. (Source: al.com, 11/19/13)

Monday, November 18, 2013

Errant drone strikes cruiser

Two sailors were treated for minor burns after the guided missile cruiser USS Chancellorsville was struck by an errant BQM-74 target drone. The Northrop Grumman-built drone struck the left or port side of the ship Saturday while it was conducting tests of its radar system off the coast of Port Mugu in Southern California. The Ticonderoga class cruiser returned to its San Diego homeport on its own power Sunday. (Sources: multiple, including AP via CSMonitor, 11/18/13; Los Angeles Times, RT com, 11/17/13) Gulf Coast note: Chancellorsville (CG 62) was built by Ingalls Shipbuilding in Pascagoula, Miss.; Tyndall Air Force Base and Eglin AFB use BQM-74 drones for training over the Gulf of Mexico.

Sunday, November 17, 2013

Survey ship clears way

PHILIPPINE SEA -- The USNS Bowditch oceanographic survey ship was first on scene off the coast of Tacloban, Republic of the Philippines, ensuring safe sea lanes in order for the George Washington Strike Group to assist the 3rd Marine Expeditionary Brigade in support of Operation Damayan. Bowditch (T-AGS 62) is an oceanographic sampling platform for surface, mid-water and ocean floor data collection. Surveys of this nature are required to confirm bottom features and identify navigational hazards in the wake of a major storm. The ship has been performing acoustical, biological, physical and geophysical surveys in the off-shore waters of the Philippines since Typhoon Haiyan struck. Bowditch is operated by the Military Sealift Command for the Naval Oceanographic Office, a component of the Naval Meteorology and Oceanography Command headquartered at the Stennis Space Center, Miss. The ship is one of six Pathfinder-class vessels with an all-civilian crew of professional mariners and scientific support personnel. (Source: Task Force 70 Public Affairs, 11/17/13)

Thursday, November 14, 2013

LHA 6 back from builder's trials

PASCAGOULA, Miss. -- Ingalls Shipbuilding division's multipurpose amphibious assault ship America (LHA 6) returned Saturday from successful builder's sea trials in the Gulf of Mexico. Ingalls' test and trials team started with dock trials Monday and then spent five days operating the ship at sea. During builder's trials, America performed all required sea trial evolutions, including the operation of the gas turbine/electric-powered propulsion system. Other tests included anchor handling, flight operations, and combat systems' evaluations. The ship will now prepare for acceptance sea trials in late January to demonstrate the same tests and operational success to the U.S. Navy's Board of Inspection and Survey (INSURV). (Source: Huntington Ingalls, 11/14/13)

Monday, November 11, 2013

Austal continues to grow

MOBILE, Ala. – Austal USA is building some of the most cutting-edge ships in the Navy inventory, and it's become the largest private sector employer in Mobile County. The company, owned by Australia's Austal, has invested $300 million here since it first bought 10 acres on the Mobile waterfront in 1999. Employment is expected to reach 4,000 by year's end. The company is building two types of aluminum vessels for the Navy, the Littoral Combat Ship and the Joint High-Speed Vessel, and it has a backlog that bodes well for the future. A feature story. (Source: al.com, 11/09/13)

Wednesday, November 6, 2013

Floating dry dock open

PASCAGOULA, Miss. -- VT Halter Marine Inc. said its new floating dry dock is now open for business and already has its first customers. The 546-foot long dock is part of an overall expansion plan at the south yard in Pascagoula, where VT Halter Marine is adding a repair facility for semi-submersible drilling rigs and Panamax-size ships. The addition of the floating dry dock will allow the company to grow into the ship repair business and start a new stream of revenue to its existing new-build business. (Source: Mississippi Press, 11/06/13)

UNO gets NRL grant

NEW ORLEANS – The University of New Orleans computer science department has been awarded a five-year, $663,000 research contract by the Naval Research Laboratory to develop next-generation defense mapping systems. The principal investigators on the project are Mahdi Abdelguerfi, chairman of the computer science department, and John Finigan, IT director of the department. The project builds on UNO's expertise in geospatial mapping. The project is expected to use open-source software and commodity hardware that will let the Navy process more map data faster and more cost effectively than the legacy systems, Abdelguerfi said. (Source: Times-Picayune, 11/06/13)

Ingalls gets exemption gift

PASCAGOULA, Miss. -- Pascagoula Mayor Jim Blevins read a proclamation celebrating Ingalls Shipbuilding's 75th anniversary, gave company President Irwin F. Edenzon a key to the city, then the City Council gave the company a 10-year exemption on ad valorem taxes. The exemption on about $18.4 million in property does not apply to school taxes. Earlier this year, the Jackson County Board of Supervisors granted a similar tax exemption worth about $100,000 a year or roughly $1.1 million over the life of the exemption. (Source: Mississippi Press, 11/05/13) Previous

Training center opens

PASCAGOULA, Miss. – Ingalls Shipbuilding officially opened the 70,000 square-foot Haley Reeves Barbour Maritime Training Academy today with a ribbon-cutting. The building, named for the former governor of Mississippi, will provide training for future Ingalls workers. The two-story building has 24 classrooms, three computer labs, a library, a bookstore, 26 offices and conference rooms, and craft labs for the shipyard's various trades. Ingalls' apprentice program involves comprehensive two- to four-year curriculum for students interested in shipbuilding careers. (Source: Ingalls via Globe Newswire, 11/06/13)

Tuesday, November 5, 2013

DDG 113 keel authenticated

PASCAGOULA, Miss. -- Ingalls Shipbuilding held a keel authentication ceremony Monday morning for the destroyer John Finn (DDG 113). The $783.5 million ship will be the 29th Arleigh Burke-class destroyer built at Ingalls. DDG 113, which is now about 20 percent complete, is expected to be delivered to the Navy in the third quarter of 2016. Ingalls also has a contract to build a 30th destroyer, Ralph Johnson (DDG 114). Fabrication started in September. (Source: Mississippi Press, 11/04/13)

Friday, November 1, 2013

Contract: USMI, $15.8M

United States Marine Inc., Gulfport, Miss., is being awarded a $15,827,132 indefinite-delivery/indefinite-quantity contract for post-production and contractor logistical support services for the combatant craft assault. The work will be performed in Gulfport and is expected to be completed by November 2017. This award is the result of a sole source acquisition. U.S. Special Operations Command, Tampa, Fla., is the contracting activity (H92222-14-D-0001). (Source: DoD, 10/31/13)

Tuesday, October 29, 2013

First Zumwalt class launched

Zumwalt launched at Bath Iron Works shipyard.
Navy photo courtesy General Dynamics
BATH, Maine -- General Dynamics Bath Iron Works successfully launched the Navy's first Zumwalt-class destroyer Monday at the Bath, Maine shipyard. The future USS Zumwalt (DDG 1000) will be the lead ship of the Navy's newest destroyer class, designed for littoral operations and land attack. Construction on the ship began in February 2009, and it's now more than 87 percent complete. It will be delivered late next year. (Source: NNS, 10/29/13) Gulf Coast note: The ship's composite deck and hangar were built by Ingalls Shipbuilding in Gulfport, Miss. Previous

Station Pascagoula work set

PASCAGOULA, Miss. -- Haskell Co. of Jacksonville, Fla., has been awarded a $4.6 million U.S. Coast Guard design-build contract for infrastructure work needed to support Fast Response Cutters (FRCs) at Coast Guard Station Pascagoula. The work will ensure that Station Pascagoula is ready to support the arrival of the soon-to-be-commissioned FRCs for the end of 2014. Work will include renovations to three support buildings, shore-tie services, pier utilities, fenders and cleats, along with the resurfacing of an existing parking lot. Haskell recently completed similar work at USCG Station Key West in support of FRC arrivals there. (Source: Seapower Magazine, 10/28/13)

Friday, October 25, 2013

NSC to be christened

PASCAGOULA, Miss. – The U.S. Coast Guard National Security Cutter Hamilton (WMSL 753), will be christened at Ingalls Shipbuilding Saturday. Hamilton is the fourth of eight planned ships in the Legend-class of technologically advanced multi-mission cutters. The ship is about 65 percent complete and will be finished in about a year and delivered to the Coast Guard in the fall of 2014. It's named after Alexander Hamilton, a Founding Father and founder of the U.S. Revenue Marine, precursor of the Coast Guard. The ship is 418 feet long, will have a crew of 120 and be homeported in Charleston, S.C. Ingalls is building two more cutters for the Coast Guard and has received a contract for another. (Sources: Sun Herald, Mississippi Press, 10/25/13)

Tuesday, October 22, 2013

LCS 1 has flooding incident

Littoral Combat Ship USS Freedom (LCS 1), first in class of two LCS variants, suffered about three feet of flooding in its bilge from discharge piping from the No. 1 gas turbine motor lube oil cooler on Oct. 20. The Wisconsin-built steel monohull ship is currently pierside in Singapore. The flooding is likely to only cause minimal operational impact. LCS 1 is expected to return to its San Diego homeport by late December. (Source: Defense News, 10/21/13) Gulf Coast note: The Independence-class LCS variants are built by Austal USA in Mobile, Ala.

Monday, October 21, 2013

Construction of tug underway

PASCAGOULA, Miss. – Construction of Signet Maritime's seventh ASD tug in less than four years, M/V Signet VIGILANT, is underway at Signet Shipbuilding and Repair in Pascagoula. The 30 metric ton vessel will be the first Castleman Maritime design for Signet with delivery slated for July 2014. The $10 million tug will operate from Signet's International Operations Center in Ingleside, Texas where it will perform rig escort, ship, and barge assist work. (Source: Mississippi Press, 10/21/13)

Sunday, October 20, 2013

Ingalls celebrates 75 years

PASCAGOULA, Miss. -- Ingalls Shipbuilding held a Family Day on Saturday to commemorate 75 years of building ships on the banks of the Pascagoula River. Mississippi's largest private employer builds Aegis-guided missile destroyers, amphibious assault ships and amphibious transport ships for the U.S. Navy and National Security Cutters for the U.S. Coast Guard. It has more than 11,000 people working in South Mississippi. In addition to a weekly payroll of about $15 million, the company from 2010 to 2012 paid $57 million in taxes. In addition to the direct impact, there’s the indirect. Each manufacturing job at Ingalls creates three to five additional jobs in small business and retail. (Source: Sun Herald, 10/19/13)

Contract: Lockheed, $21.3M

Lockheed Martin, Mission Systems and Training, Moorestown, N.J., is being awarded a $21,350,270 modification to previously awarded contract for DDG 51 Combat System Ship Integration Technical Data Packages and Design Budget Engineering Team Packages associated with incorporating the AEGIS Weapon System and associated combat system elements into DDG 51 class ships. Twenty-six percent of the work will be done in Pascagoula, Miss., with 41 percent done in Moorestown, N.J., 26 percent in Bath, Maine, 5 percent in Washington, D.C., 1 percent in Port Hueneme, Calif., and Syracuse, N.Y. Work is expected to be completed by September 2014. The Naval Sea Systems Command, Washington D.C., is the contracting activity. (Source: DoD, 10/18/13)