Thursday, August 9, 2018
$2.5M MARAD grant for NOLA
About $5M in federal grant funding was awarded Aug. 8 to enhance existing marine highways serving ports in Louisiana, Virginia, New York, and Connecticut; and support for the development of new container-on-barge services in Kentucky and Rhode Island. U.S. Department of Transportation Secretary Elaine L. Chao announced $4,872,000 in grants for six projects through the Maritime Administration’s (MARAD) Marine Highway program, including more than $2.5M for the Port of Baton Rouge and Port of New Orleans Container-on-Barge operations in NOLA. Marine Highways provide new modal choices for cargo shippers by reducing transportation costs while at the same time reducing road maintenance costs and improved safety. MARAD works with public and private stakeholders to support the expanded use of navigable waterways to relieve landside congestion, provide transportation options, and generate public benefits by increasing efficiency of its surface transportation system. Expanding the use of waterways also support jobs at American ports and shipyards. The Louisiana container-on-barge grant will be used to purchase marine terminal and handling equipment for efficient loading-unloading of container-on-barge operations in New Orleans. The existing service relocates empty containers in Memphis to meet export customer demand in Baton Rouge. This grant will allow the service to expand to NOLA’s France Road terminal and will allow northbound containers to be off-loaded as far north as Memphis. (Source: Marine Link 08/09/18)
Dillard to offer water m’gmt program
Dillard University students in New Orleans will have an opportunity this fall to prepare for water management jobs in government and the private industry with a new program being established. Dillard’s Urban Water Management Certificate Program is the first and only of its kind in Louisiana, according to a Dillard media release. The program is designed to teach students how to handle flooding, storm-water management, sinkholes, and sinking land caused by subsidence. Students will also learn how to protect cities from water-borne illnesses by providing clean and safe water to residents. (Source: NOLA.com 08/09/18)
SECNAV: Improve contractor relations
Navy Secretary Richard Spencer said he is pushing sea-service officials to improve on those often “antagonistic” dealings with defense contractors. “We’ve changed the dialog with our suppliers,” SECNAV told Bloomberg News Aug. 7 at an initiatives-review session. In some cases, relations between the Navy and contractors were not the healthiest they could have been, he said. But those contractors need to know that funding dollars don’t grow on trees, but he was a “responsible buyer” who understands contractors’ need to make a profit. “I was in business. I get it,” said Spencer, former vice chairman of the Intercontinental Exchange Inc. The Navy has to sit down with contractors and show them what resources are available and plans to deploy those funds. Huntington Ingalls Industries, General Dynamics, Raytheon, and Lockheed Martin are among the Navy’s biggest prime contractors. (Source: Bloomberg News 08/08/18) Gulf Coast Note: HII’s Ingalls shipyard in Pascagoula. Miss., builds multiple ships for the Navy and the Coast Guard’s National Security Cutter.
Wednesday, August 8, 2018
BIW’s Year 4 option for LCS plans
General Dynamics-Bath (Maine) Iron Works is awarded a $33,592,059 cost-plus-award-fee modification to previously awarded contract (N00024-14-C-4313) to exercise Option Year Four for the accomplishment of the planning yard support services for both variants of the Littoral Combat Ship (LCS) class of ships. This option exercise is for planning yard services for both Freedom and Independence variant in-service ships. BIW is the sole planning yard providing engineering, planning, ship configuration, material and logistics support to maintain and modernize both variants. Work will be performed in Maine, and is expected to be completed by August 2019. Naval Sea Systems Command of Washington, D.C. is the contracting activity. (Source: DoD 08/08/18) Gulf Coast Note: Austal USA of Mobile, Ala., builds the Independence variant of LCS. BIW builds the Freedom class.
Tuesday, August 7, 2018
‘One Lake’ project and oysters
The manager of one of the Gulf Coast’s largest oyster processors is wary of the proposed ‘One Lake’ flood-control project on the Pearl River near Jackson, Miss. “I have a lot of concerns about the project,” Jennifer Jenkins, whose family has owned Crystal Seas Seafood in Pass Christian, Miss., since 1966. Some 50 people listened to 30-minute presentation by engineers and lawyers Aug. 2 at the Infinity Science Center not from the Pearl River. It was given by lawyers and engineers for the Rankin-Hinds Pearl River Flood and Drainage Control District. “I still have a lot of concerns that it’s going to affect the oyster and seafood industry and parts of the lower Pearl River,” Jenkins told the Sun Herald. The likely-$350M project would use a low-head dam below Interstate 20 near Jackson to create a 1,500-acre lake. Its proponents claim it would reduce flooding in Jackson and surrounding counties. But others, like Jenkins, fear the project will restrict the flow of water that would normally make its way into the lower Pearl River Basin, which would harm river habitats, impact the salinity of the Mississippi Sound and threaten endangered animal species and the oyster industry. (Source: NOLA.com 08/06/18)
Weeks Marine: $112.8M contract
Weeks Marine Inc. of Covington, La., was awarded an $112,846,250 firm-fixed-price contract for Mississippi coastal improvements program, comprehensive barrier island restoration plan, and Ship Island Phase-Two. Bids were solicited via the Internet with three received. Work will be performed in Ship Island, Miss., with an estimated completion date of Sept. 11, 2019. FY 2014 civil works funds in the amount of $112,846,250 were obligated at the time of the award. U.S. Army Corps of Engineers of Mobile, Ala., is the contracting activity. (Source: DoD 08/07/18)
Gulf Coast Navy energy winners
In an announcement Aug. 3, the Secretary of the Navy named Naval Air Station Whiting Field, Fla., as the recipient of the Department of the Navy Energy Excellence Award for 2018 in the Navy Small Shore category. The Navy’s annual Energy Excellence Awards program promotes excellence in the areas of energy security, new technology, innovation, program management and efficiency across the department. In addition to the SECNAV award winners, the following Gulf Coast states’ commands were recognized for their achievements in energy program management. At the Platinum level of achievement was NAS Pensacola; Naval Mobile Construction Battalion 3 of Gulfport, Miss. Gold level commands included NAS Meridian, Miss. At the Blue level was NAS/JRB New Orleans and Naval Support Activity Panama City, Fla. (SECNAV 08/03/18)
Monday, August 6, 2018
Entrust awarded $49M IT contract
Sentient Digital Inc., doing business as Entrust Government Solutions, of New Orleans is awarded a total $49,000,000 indefinite-delivery/indefinite-quantity contract for information technology (IT) engineering support services. IT services in this contract will assist Military Sealift Command’s (MSC) Command, Control, Communications, and Computer Systems (C4S) division (N6) in providing and sustaining Department of Defense (DoD) and the Navy compliant technical C4S solutions. Additionally, this contract will satisfy emerging requirements, enhance and develop IT capabilities in support of MSC’s mission and assist in the development of governance to ensure IT capabilities align to MSC N6’s strategic business support plan, MSC N6’s technical architecture road maps, DoD, and Navy mandates. The solutions primarily satisfy emergent cyber security mandates and technical refreshes for end of life hardware and software. Work will be performed in Norfolk, Va., and is expected to be completed Aug. 15, 2023. FY 2018 working capital funds in the amount of $10,000 will be obligated as the initial task order and will satisfy the minimum guarantee requirements. Contract funds will expire at the end of the current fiscal year. This contract was competitively procured, with proposals solicited via the Federal Business Opportunities website, with eight offers received. The Navy’s Military Sealift Command, Norfolk, Virginia, is the contracting activity. (Source: DoD 08/06/18)
IG, Navy spar over new MCM package
The Defense Department’s Inspector General has criticized the Navy's management of a new mine-countermeasures (MCM) detection system for Littoral Combat Ships, which prompted Navy officials to declare that three of seven parts of the MCM mission package had reached initial operating capability (IOC) this summer. That meant sailors were considered equipped and trained to conduct mission operations with the AN/ASQ 235 Airborne Mine Neutralization System, Airborne Laser Mine Detection System, and the Coastal Battlefield Reconnaissance and Analysis Block I system. When the Pentagon IG reviewed the three platforms, investigators found signs they weren't meeting requirements. Navy leaders hit back and challenged the findings. ALMDS and AMNS had "completed and exceeded expectations" for testing required by the LCS mine countermeasures mission package, and the COBRA successfully completed its first round of initial operational tests and evaluations to meet the requirements for IOC, the assistant secretary of the Navy told the IG. Navy officials argued that having training squadrons use the systems is the best way to identify and correct performance gaps. Those squadrons, working with ALMDS and AMNS, have not reported problems, Navy officials said; and shortcomings with COBRA have been corrected. The IG warned that: "Entering full-rate production without demonstrating a system can perform as required may require costly retrofits to fix undiscovered system deficiencies," and delay planned decommissioning of legacy ships, helicopters, and associated equipment if those deficiencies render the new system unable to perform full (MCM) missions. (Source: Military.com 08/03/18) Gulf Coast Note: Independence variant LCS are built at Austal USA in Mobile, Ala.
Austal ships clear major hurdle
Two Austal USA-built ships cleared their last hurdle last week before joining the fleet. The expeditionary fast transport Burlington and the Littoral Combat Ship Charleston both successfully completed acceptance trials, according to press releases from Naval Sea System Command and Austal USA. The Mobile, Ala.-based shipyard is coming to an end of building its 12 EPFs - Burlington is EPF-10; while EPF-11 Puerto Rico and EPF-12 Newport are under construction. There’s a way to go for LCS builds with additional contract awards expected out of the FY 2019 budget, which authorized three LCS, but it’s unclear which of two builders – Marinette, Wis., shipyard – would get those awards. LCS Charleston is the ninth of the Austal-built trimaran hulls to be constructed by Austal. Plans are for it to be delivered to the Navy by the end of 2018. The yard is also on various stages of construction for several other LCS: Cincinnati (LCS 20) is preparing for trials. Final assembly is underway on Kansas City (LCS 22) and Oakland (LCS 24), according to Austal. Modules for the future USS Mobile (LCS 26) are under construction in the manufacturing facility and construction on Savannah (LCS 28) commenced in mid-July.” (Source: Defense News 08/05/18)
HGIM makes bid to GulfMark
HOUSTON – Houston-based GulfMark Offshore, Inc. (“GulfMark”) confirmed Aug. 6 that it had received a non-binding, unsolicited proposal from HGIM Corp. (“Harvey Gulf”) of New Orleans to combine the companies through a merger in which GulfMark would acquire Harvey Gulf. Pursuant to the Harvey Gulf proposal, GulfMark stockholders would own 41.2 percent of a new company. Harvey Gulf emerged from bankruptcy July 2 as a private company. Its proposal represents an enterprise value of an unevaluated $900M. GulfMark’s public equity valuation, as of July 13, the day prior to its announcement of a proposed merger with Tidewater Inc. ("Tidewater") of Houston, is $337M. The GulfMark Board of Directors will review the Harvey Gulf proposal in compliance with obligations under its merger agreement with Tidewater. GulfMark’s board seems to believe that the Tidewater merger is in the best interest of stockholders and continues to recommend them to adopt the Tidewater merger agreement at a meeting this fall. (Source: Globe News Wire 08/06/18) GulfMark Americas has a sector office in Larose, La.
Woman ID'd from Lake Pontchartrain
NEW ORLEANS - The Coast Guard is searching for a missing person, after rescuing another, in Lake Pontchartrain north of New Orleans on Aug. 6. The missing person has been identified as 32-year-old Sadie Thibodeaux. Coast Guard Station New Orleans rescued 43-year-old Michael Lee Farley at 7:03 a.m. Monday, about a mile north of Lakeshore Drive in Lake Pontchartrain. Farley was reported in good condition and was transferred to CGSNO. Watchstanders received a report at 5:47 p.m. on Aug. 5 of an unmanned 34-foot sailing vessel, the Good Humor, with a dog and cell phones aboard in view of Lakefront Airport. CG crews and partner agencies searched throughout the night. Anyone with information is requested to contact Sector New Orleans at (504) 365-2200. (Source: Coast Guard 08/06/18) UPDATE: A woman's body was found in Lake Pontchartrain Aug. 7 following a mysterious Sunday boating accident, according to New Orleans Police Department. The body has not been identified. About 5:20 p.m., a boater observed a body in the water and notified those aboard a Department of Wildlife and Fisheries vessel, police said. (Source: NOLA.com 08/07/18) UPDATE 2: The Orleans Parish Coroner identified the woman's body recovered from Lake Pontchartrain Aug. 7 as Sadie Thibodeaux, 32. Her cause of death remains under investigation, the coroner's office said. (Source: NOLA.com 08/09/18)
Friday, August 3, 2018
Petters: ‘Exciting time' for shipbuilders
Congress and the Defense Department are in the middle of a two-year spending spree, and Huntington Ingalls Industries’ (HII) leadership is positioning itself to grab as many construct awards as possible before the funding window closes – likely FY 2020. The FY 2019 National Defense Authorization Act (NDAA) gained Senate approval this week ahead of HII’s quarterly earnings call July 2 by President/CEO Mike Petters. HII reported revenues of $2B. The increase was due to work at the company’s Newport News (Va.) Shipbuilding facility that builds carriers and parts of the Virginia-class submarines, he said. “This is the most exciting time I’ve seen in shipbuilding in 30 years,” Petters told USNI News. HII has “an offer in to the Navy” to build two aircraft carriers, 10 submarines, and is in a competition for a share of 10 destroyers. The Navy is evaluating bids for a new guided-missile frigate, with a contract award anticipated in 2020, Petters said. HII’s Ingalls Shipbuilding in Pascagoula, Miss., submitted a bid for the FFG-X work. Also, Congress and DoD are considering a multi-year plan for buying more San Antonio-class amphibious warships (LPDs). (Source: USNI News 08/02/18)
HII: $165.5M for first Flight II LPD
PASCAGOULA, Miss. - Huntington Ingalls Industries (HII) announced Aug. 3 that its Ingalls Shipbuilding division in Pascagoula, Miss., has received a $165.5M cost-plus-fixed-fee advance procurement contract from the Navy to provide long-lead-time material and advance construction activities for amphibious transport dock ship LPD 30 - the first Flight II LPD. “This is a significant milestone as we embark toward a new flight of LPDs,” said Ingalls Shipbuilding President Brian Cuccias. Flight II LPDs will meet the requirements and needs of the Navy-Marine Corps team. Ingalls has a vendor base of some 400 companies in 30 states that will be involved in the LPD Flight II program. Ingalls already has delivered 11 of these San Antonio-class (LPD 17) ships to the Navy. Two more ships are under construction. (Source: HII 08/03/18)
Thursday, August 2, 2018
Harvey Gulf’s new board
Harvey Gulf International Marine’s parent, HGIM Corp., announced the appointment of a new board of directors following the firm’s emergence from Chapter 11 proceedings. The seven-member board includes two current members and five new ones, each with expertise in areas suited to support the company’s operation and development. (Source: Work Boat 08/01/18) Harvey Gulf International Marine is HQ'd in New Orleans, and with an operations office at Port Fourchon, La.
La. ‘dead zone’ smaller … however
The annual summertime low-oxygen "dead zone" along Louisiana's Gulf Coast is dramatically smaller this year – 2,720 square miles - LSU researchers announced July 31, making it the fourth smallest dead zone since 1985. But, it’s 50 percent larger than the target size set in 2008 by a federal task force concerned about the effects of hypoxia on Gulf of Mexico fisheries. The 2018 dead zone is smaller than the 5,770 square mile average from 2014-18, and only a third the size of last year's largest ever dead zone (8,776 square miles). Source: NOLA.com 07/31/18)
HII $27.4M more for DDG 62
Huntington Ingalls Industries' Ingalls Shipbuilding of Pascagoula, Miss., is awarded a $27,469,298 cost-plus-fixed-fee contract modification to a previously awarded contract (N00024-17-C-4444) for the execution of USS Fitzgerald (DDG 62) emergent repair and restoration. This effort shall provide for additional collision repairs as well as maintenance and modernization of USS Fitzgerald (DDG 62). Work will be performed in Pascagoula, and is expected to be completed by January 2020. FY 2018 Navy operations and maintenance, and FY-17 other Navy procurement funding in the amount of $20,621,275 will be obligated at time of award; and $19,981,782 will expire at the end of the current fiscal year (Sept. 30). Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. (Source: DoD 08/02/18)
CG ends search; bodies recovered
NEW ORLEANS – The Coast Guard is searching for two males around Central Public Beach near Dauphin Island, Ala., in the afternoon of July 2. Coast Guard Sector Mobile received a notification at 2:47 p.m. of a 17-year-old male and 40-year-old male last seen entering the water from the beach. Anyone with information can contact Sector Mobile at 251-441-6211. (Source: Coast Guard 08/02/18) UPDATE: The CG ended its search for the duo Friday. One body was recovered at 6:07 p.m. Thursday and the second at 8:28 a.m. Friday.
LCS-18 finishes acceptance trials
The ninth Independence-variant Littoral Combat Ship (LCS), the future USS Charleston (LCS-18), finished acceptance trials in mid-July, according to a Navy announcement Aug. 1. The Independence-variant ships (with even-numbered hulls) are built by Austal USA in Mobile Ala. The acceptance trials finished July 19 in the Gulf of Mexico after a set of demonstrations both in-port and underway for the Navy’s Board of Inspection and Survey (INSURV). The trials are generally the last milestone before a ship is delivered to the Navy. The Navy conducted tests to demonstrate the ship’s propulsion plant, ship-handling abilities, and auxiliary systems. While underway, LCS-18 demonstrated its bow thruster, twin boom extensible crane operations with an 11-meter rigid-hull inflatable boat, surface and air self-defense exercises; and it demonstrated ship handling and maneuverability with high-speed steering and anchor operations. “Another solid acceptance trial by the Navy and industry team in Mobile,” said LCS Program Manager Capt. Mike Taylor. After delivery, the ship is to undergo a post-delivery availability that covers crew training, certification, and familiarization exercises in the Port City. Afterward, LCS 18 will sail to its homeport of San Diego alongside other Independence ships. The previous LCS variant, the future USS Tulsa (LCS-16), was delivered in April and will be commissioned in San Francisco in February 2019. Austal USA is also building the future Cincinnati (LCS-20), Kansas City (LCS-22), Oakland (LCS-24), and Mobile (LCS-26). Austal also won contracts to build the future USS Savannah (LCS-28) and Canberra (LCS-30) in 2017. (Source: Defense Daily 08/01/18)
Wednesday, August 1, 2018
$45M flood control construction
Affolter Contracting Co of La Marque, Texas (W912EE-18-D-0003); B&K Construction Co. of Mandeville, La. (W912EE-18-D-0004); Circle LLC of Belle Chasse, La. (W912EE-18-D-0005); and Phylway Construction of Thibodaux, La. (W912EE-18-D-0006), will compete for each order of a $45,000,000 firm-fixed-price contract for flood control construction along the Mississippi River and its tributaries. Bids were solicited via the Internet with 10 received. Work locations and funding will be determined with each order, with an estimated completion date of Aug. 1, 2021. U.S. Army Corps of Engineers of Vicksburg, Miss., is the contracting activity. (Source: DoD 08/01/18)
Subscribe to:
Posts (Atom)